Pages

Monday, June 13, 2011

Everyday the school looks different.



The awnings from both sides of the Form 3 classrooms to the hall are up. This provides more shade and shelter from the rain when the students move to the hall.














This new awning is much longer compared to the previous awning so the students will not get drenched while walking to the hall during rain.




The view from the hall shows the transparent but strong plastic mounted all along the top sides of the stairs leading to the canteen.

The students and teachers will be sheltered from the wind and the rain when they walk to the canteen.










The two sinks near the KH bengkel have been repaired.







Of course I love most to see the colour changes taking place as the painters begin to touch up the vertical pillars with the terraccota colours.















The front porch is almost ready.
























The painters are working on the vertical pillars today and doing the final touches.






















No comments:

Post a Comment